Authorities have reopened Babusar Top Road after heavy snowfall forced a three-day closure. The decision has brought relief to tourists, drivers, and local travelers.
Police confirmed that traffic resumed on October 17 from both Gilgit and Khyber Pakhtunkhwa. The reopening restored an important travel route between northern Pakistan and other regions.
Heavy Snowfall Disrupts Traffic
Authorities closed Babusar Top Road from the Gilgit side after heavy snowfall made travel difficult.
The closure caused serious problems for people traveling between Gilgit and Mansehra. Many drivers had to delay their journeys until officials reopened the route.
Tourists and local residents also faced travel difficulties during the three-day shutdown.
Police said the road reopened for all types of vehicles after authorities restored traffic movement.
Three Stranded Oil Tankers Recovered
The snowfall also left three oil tankers stranded at Babusar Top for three days.
Police confirmed that officials recovered the vehicles after the road reopened. The tankers then continued their journeys.
The recovery brought relief to the drivers who had remained stuck during the closure.
Babusar Top serves as an important mountain route connecting Gilgit-Baltistan with Khyber Pakhtunkhwa.
However, the high-altitude road faces travel disruptions during periods of heavy snow and harsh weather.
The reopening will help travelers move between the two regions more easily.
The incident also highlights the challenges of mountain travel during changing weather conditions.
Although authorities have restored traffic, drivers should check local weather forecasts before traveling.
Travelers should also follow police instructions and remain alert to sudden weather changes in mountainous areas.
